ABP Foods, Doncaster
Client: Armstrong Priestley
Description: Civil engineering works for a new sprinkler installation. The work comprised of a circular reinforced concrete tank base, reinforced concrete pump house base plus the associated pipework and thrust block installations.
Laydown Area, Blackburn
Client: Serimax
Description: New macadam laydown area including soil strip, bulk excavation, sub-base, kerbing and macadam works.
Intack Bus Depot, Blackburn
Client: Transdev Lancashire United
Description: Upgrade work including new external hardstandings along with the maintenance of the existing drainage system.
Waters Meeting, Bolton
Client: B&E Boys Ltd
Description: A mixture of new build units and the upgrading of existing infrastructure on this large industrial development.
Warehouse Extension, Hapton
Client: SFA Ltd
Description: Undertaken wholly by DTM Groundworks Ltd, this extension to an existing and in-use warehouse facility involved earthworks, foundations, brickwork and cladding, electrical fit out works and external works.
Albion Mill, Waterfoot
Client: B&E Boys Ltd
Description: Upgrade of this industrial facility with new fencing, access gates and external works.
Aqua Fabrications, Skelmersdale
Client: Weiser Construction Ltd
Description: Construction of a new industrial unit on a brownfield site. Works included foundations, drainage, services and hard landscaping.
J Stell & Sons, Keighley
Client: B&E Boys Ltd
Description: Installation of foundations for a new biomass boiler installation including the reinforced concrete work for the automated feeding equipment.
Waddington Waste, Bradford
Client: Weiser Construction Ltd
Description: New waste handling building at P. Waddington and Co. Ltd, Bradford. Our works included foundations, floor slabs, drainage, concrete retaining walls and hard landscaping.
Shirley’s Waste Paper, Blackburn Interchange, Darwen
Client: B&K Building Services
Description: New waste storage and processing plants including dock levellers, machine pits built within the internal floor slab and a weighbridge. Infrastructure and drainage works included an underground tubosider-style water retention tank, foul pumping chamber and connections to the existing foul and surface systems.
Ferguson Polycom, Chadderton
Client: B&E Boys Ltd
Description: Reconfiguration of an existing industrial complex. Numerous reinforced in-situ concrete plinths, pits and slabs constructed both internally and externally to receive new plant and equipment for the new client.
John Cotton, Bradford
Client: Thistle Construction Ltd
Description: Vehicle maintenance shed with inspection pits integrated into the floor slab. Extensive realignment of the existing site road network was undertaken along with the installation of drainage and services for street lighting.
Fuel Storage Tank Base, Huncoat
Client: Fueltek Ltd
Description: Sub-contractor designed and installed fuel tank base complete with ductwork cast in for fuel lines, power and data services. All works carried out on an existing live industrial site.
Tensar Manufacturing, Blackburn
Client: Tensar Manufacturing Ltd
Description: Engineering and preparation works associated with the installation of new plant and equipment.