Educational

Bacup and Rawtenstall Grammar School

Client: TJM Projects Limited

Description: DTM Groundworks Ltd were contracted to carry out the foundations and drainage to the new dining room extension at this grammar school. A very tight and difficult to access site meant the careful use of small machinery. The nature of the site also imposed restrictions on access times and noise.


St Joseph’s Primary School, Horwich

Client: B&E Boys Ltd

Description: Extensive external works package involving bulk earthworks, kerbing, foul and surfsce water drainage, services and landscaping. We also carried out site clearance and foundation works to a classroom extension.


Cookridge Street, Leeds

Client: Broadley (Group) Ltd

Description: New build high-end student accommodation in Leeds city centre. DTM Groundworks Ltd’s work involved drainage installations in the basement of the new building.


Sedbergh School

Client: B&E Boys Ltd

Description: New sports hall. Large civil engineering project comprising topsoil strip, reduced level excavation, foundations, drainage and construction of a 6 metre high reinforced concrete retaining wall complete with Sika tanking / waterproofing system, all installed by DTM Groundworks Ltd.


IQRA, Bradford

Client: Castlehouse Construction Ltd

Description: New extension to a community primary and nursery school including foundations, drainage plus hard and soft landscaping work.


Parrenthorn High School, Manchester

Client: B&E Boys Ltd

Description: New extension to existing building including complex piling works up against and existing structure.


Emmanuel Primary School, Holcombe Brook, Bury

Client: B&E Boys Ltd

Description: This project started with bulk excavation works and the demolition of part of the existing school, all of which had to be carried out within the tight confines of the existing school boundaries. The demolition and installation of temporary toilet blocks necessitated the investigation, design and extensive alterations to the existing foul and surface water drainage systems. The creation of a temporary access for teachers, parents and pupils was also required. Foundations and external works form the remainder of the project.


Reddish Technology College, Stockport

Client: Globe Management Services Ltd

Description: Foundations, floor slabs and extensive drainage works all carried out within an existing school site. Macadam, pre-cast concrete paving and kerbing works will complete the project.


Holcombe Brook Primary School, Bury

Client: B&E Boys Ltd

Description: Main foul drainage connection to existing system in busy main road along with on-site drainage works.


Grammar School, Whalley Range, Manchester

Client: Globe Management Services Ltd

Description: Part new-build and part refurbishment at and existing working Grammar School. In addition to the foundations, drainage and external works the contract involves extensive work in the existing school grounds installing and adapting the existing service installations.


Click here to return to the Past Projects main menu.


Sheet piling to existing classroom, Parrenthorn High School, Manchester

Landscaping, Reddish Vale Technology College, Stockport

DTM - Internal ground floor slab, Stonyhurst College, Clitheroe

DTM - In-situ retaining wall, Stonyhurst College, Clitheroe

DTM Groundworks Ltd - Stonyhurst college, Clitheroe